Turns a change the plan has already decided into how the plan actually works, and keeps it in place.

Three minute read21 sourcesUpdated November 20, 2026

For more, the full reference below has 15 measures, 7 key documents, 6 data inputs, 5 data flows, 5 data exhaust signals, and 21 sources.

01What it is

In this guide's working definition, this function turns a change the plan has already decided into how the plan actually works: redesigned processes, roles, and systems, used by the people who do the work and kept in place. Almost nothing published describes how health plans run this general corporate function. Its best known part is training, but health care research treats adoption (people use it), fidelity (they do it as designed), and sustainability (they keep doing it) as separate outcomes.4 The Enterprise PMO, the project management office, decides which projects get funded; this function asks whether people and processes change.

02In everyday terms

It works like rearranging a shared kitchen. Installing the new shelves is the project. The change is done when everyone stops reaching for the old drawer, and it stays done only if nobody quietly moves things back.

03Why it exists

Much of the change at a plan is forced by a rule with a date, such as the Prior Authorization API, a standard electronic connection for approval requests, required in Medicare Advantage beginning January 1, 2027.8 A redesigned process must keep meeting existing limits while it changes, such as, in Medicare Advantage, 7 calendar days for standard prior authorization decisions.9 A new Medicaid contract or population brings a state readiness review, started at least three months ahead; for a new program or a plan new to the state, it includes on site interviews with staff and leaders.12 Our judgment: without someone owning adoption, a plan can be live on a new system and still working the old way.

04How we got here

The most repeated figure about this work, that 70% of change efforts fail, has no measured base. A peer reviewed critique of five published versions found "no valid and reliable empirical evidence" for it.1 That does not mean change usually succeeds. A 2004 systematic review asked how new ways of working spread and last in health services,7 and in 2009 researchers combined overlapping theories into one framework, the Consolidated Framework for Implementation Research, updated in 2022.23 For plans, large changes often come industry wide by rule: ICD-10 diagnosis and procedure codes took effect October 1, 2015, after Congress moved the date from October 1, 2014.1011

05How it works today

  1. Leaders decide a change, or a rule or contract sets one with a date89
  2. The change team maps the processes, roles, and systems it touches
  3. Process owners and front line staff redesign the work
  4. Compliance checks the new process against the rules
  5. Managers and trainers prepare and train staff
  6. The plan goes live, after a state readiness review for a new Medicaid contract12
  7. Supervisors track adoption and retire the old way
See the process mapWho does what at each step, with owners, documents, data, data flows, and exhaust

Scroll the map sideways.

Leaders, regulators Change team Process owners, staff Compliance Managers, trainers changes needed new Medicaid contract Decides the change1Plan leaders, CMS,or the stateDecision, rule, orcontract amendmentEffective dateRules, memos,contract amendmentsDate the changewas decided Maps the impact2Change team withprocess ownersChange impactassessmentProcesses, roles,systems affectedWorkshops withaffected teamsTouch pointsfound late Redesigns the work3Process owners andfront line staffNew procedures,job aidsCurrent volumes,error ratesDrafts tocomplianceOld steps keptas workarounds Checks the rules4Compliance staffChecklist: limits,notices, licensesRules that applyto the processBack to the teamif changes neededFindings beforego live Trains staff5Managers andtrainersTraining plan,training recordsWho needs training,role by roleClasses, job aids,practice systemsTraining completedagainst assigned Goes live6Business owners andchange teamGo live checklistTest results,staff readinessCutover to thenew processProblems in thefirst weeks Readiness reviewState Medicaid agencyReadiness reviewto CMSPlan documents,staff interviewsDesk review, on sitewhere requiredReadiness findings Tracks adoption7Supervisors andprocess ownersAdoption reportUse of the new way,errors, backlogsReport to leadersand the PMOTeams still workingthe old way

Across all steps: a chief operating officer or a strategy executive typically sponsors the work, process owners own the new way of working, and compliance signs off on regulated processes. Plans differ.

Select a step on the map to see its owner, documents, data, data flow, and exhaust together.

StepWhat happensWhoDocumentsDataHow it movesWhat it leaves
1Leaders decide a change, or a rule or contract sets one with a datePlan leaders, or CMS or the state for a rule or contractA leadership decision, a rule, or a contract amendmentThe effective dateFederal rules, CMS memos, and contract amendmentsThe date the change was decided
2The change team maps the processes, roles, and systems it touchesChange team with process ownersChange impact assessmentProcess maps, roles, and systems affectedWorkshops with affected teamsTouch points found late
3Process owners and front line staff redesign the workProcess owners and front line staffNew procedures and job aidsCurrent volumes and error ratesDrafts to complianceOld steps kept as workarounds
4Compliance checks the new process against the rulesCompliance staffChecklist of time limits, notices, and license rulesThe rules that apply to the processBack to the team if changes are neededFindings before go live
5Managers and trainers prepare and train staffManagers and trainersTraining plan and training recordsWho needs training, role by roleClasses, job aids, and practice systemsTraining completed against training assigned
6The plan goes live, after a state readiness review for a new Medicaid contractBusiness owners and the change team; the state Medicaid agency for a new contract or populationGo live checklist; the state's readiness review, submitted to CMSTest results, staff readiness, and plan documentsCutover to the new process; desk review by the state, with an on site review for a new program or a plan new to the stateProblems in the first weeks and readiness findings
7Supervisors track adoption and retire the old waySupervisors and process ownersAdoption reportUse of the new process, errors, and backlogsReport to leaders and the PMOTeams still working the old way

A typical flow. Step 6's state review is from the federal Medicaid rule;12 the rest is general practice, because no public source describes how health plans run change management. Plans differ, and consultants or vendors may run some steps.

We found no public count of change programs or retrained staff at health plans: Not sourced yet. In other health care settings, a review of 125 studies found partial continuation of new programs common, and where providers were observed directly, fewer than half kept a practice up at high fidelity.5 When a change ends jobs, federal law requires 60 days' written notice before a covered plant closing or mass layoff, to employees or their representative, the state, and local government.17 Other laws or agreements can require more.18 Staffing and training belong to Human Capital.

06AI Opportunities

In a 2025 state regulators' survey, 86 of 93 health insurers used, planned to use, or planned to explore AI.14 We found no non-vendor measure of how many plan staff use AI tools: Not sourced yet. The closest evidence is from clinicians offered optional AI scribes: 35 of 92 attending physicians (38%) at one emergency department and 190 of 958 clinicians (19.8%) at one cancer center used them.1516 AI can help map which processes and roles a change touches and show where use lags.

Our ruleCount a change as done when the work has moved, not when the system is live.

The Quadruple Aim

GoalAI in change workWhat decides it
Patient experienceNone directlyWhether member service holds steady through go live
Population healthNone directlyWhether changed care processes reach the front line
Per capita costSmallWhether the old process is retired, not run alongside
Work life of clinicians and staffYes, if training is aimed where use lagsWhether staff help design the work before it changes

Our judgment, using the published framework.20

The full reference

These headers appear in this order on every page.

Who owns itAn operations or strategy executive, with process owners accountable for the new way of working
Executive
Chief operating officer or a strategy executive, depending on the plan
Runs it day to day
A change management lead, or the PMO at some plans
Does the work
Change managers, process owners, trainers, supervisors, and the front line staff whose work changes
Oversight
An executive committee. Medicare Advantage plans must train employees, executives, managers, and the governing body on compliance at least yearly and at orientation.13 For a new Medicaid contract or population, the state reviews readiness before go live.12
Often outside the plan
Consulting firms, training vendors, and the software vendors whose systems change the work
The question it answers
Is the new way actually how the work gets done, and will it still be in a year?
How it's measured15 measures, financial, operational, and member and quality, each tied to an industry standard where one exists

Financial

Cost of the change effortInternal

Staff time, training, and outside help spent getting a decided change adopted

Standard
Internal or benchmarking, no standard found. Implementation cost is one of eight outcomes in a research taxonomy4
Public number
Not sourced yet
Example
Illustration, not data: 4,000 staff hours of training at $50 an hour is $200,000
Cost of running both waysInternal

What the plan spends keeping the old process alive after the new one is live

Standard
Internal or benchmarking, no standard found. Whether promised savings arrive is tracked by the Enterprise PMO
Public number
Not sourced yet
Example
Illustration, not data: a team still keying cases into the old system six months after go live

Operational

AdoptionOther standard

The decision or action to try or use the new practice, also called uptake4

Standard
Research taxonomy of implementation outcomes, not a regulatory standard4
Public number
Not sourced yet for plans. Clinicians offered an optional AI scribe: 38% of 92 attending physicians at one emergency department, study published 202615
Example
Illustration, not data: 140 of 200 intake staff using the new screen in week four is 70%
PenetrationOther standard

How far the practice is built into the setting and its parts4

Standard
Research taxonomy, not a regulatory standard4
Public number
Not sourced yet
Example
Illustration, not data: cases handled the new way over all eligible cases
FidelityOther standard

Whether the new process is done as designed4

Standard
Research taxonomy, not a regulatory standard4
Public number
Not sourced yet for plans. In observed health care studies, fewer than half of providers kept practices up at high fidelity, 2012 review5
Example
Illustration, not data: an audit of 50 cases finds 12 skipped the new check
SustainabilityOther standard

Whether the new way is kept in stable, ongoing operations4

Standard
Research taxonomy, not a regulatory standard4
Public number
Not sourced yet for plans. Partial continuation was common across 125 health care studies, 2012 review5
Example
Illustration, not data: use measured again a year after go live
Staff readinessOther standard

Staff's shared resolve to make the change and shared belief they can6

Standard
Defined in implementation research; its scientific basis is described as limited6
Public number
Not sourced yet
Example
Illustration, not data: a short survey of affected teams before go live
Mandated dates metCMS required

Required changes working by their legal date

Standard
Set by rule, such as the January 1, 2027 Prior Authorization API8
Public number
Not sourced yet
Example
ICD-10 codes were required from October 1, 201510
Time limits kept during changeCMS required

Regulated decisions still made on time while a process is being changed

Standard
Medicare Advantage: 7 calendar days for standard prior authorization requests, from January 1, 20269
Public number
Not sourced yet
Example
Illustration, not data: a new intake screen slows the first week and pushes 30 requests past day 7
Compliance training completedCMS required

Employees, executives, managers, and board members trained on compliance

Standard
Medicare Advantage: at least yearly and at orientation13
Public number
Not sourced yet
Example
Our judgment: training on a changed process is separate, and plans set their own targets for it
Readiness review resultOther standard

Whether the state finds the plan ready for a new contract or population

Standard
Federal Medicaid rule, run by the state, started at least three months before12
Public number
Not sourced yet
Example
The review covers administrative staffing; an on site review includes interviews with staff and leaders12
Time to proficiencyInternal

How long staff take to work at their old speed and accuracy in the new way

Standard
Internal or benchmarking, no standard found
Public number
Not sourced yet
Example
Illustration, not data: cases per hour back to the old level by week six
Errors and backlog after go liveInternal

Rework and waiting work in the first weeks, compared with before

Standard
Internal or benchmarking, no standard found
Public number
Not sourced yet
Example
Illustration, not data: the error rate on a changed form rises from 2% to 6%, then falls

Member and quality

Complaints about the planStars

Complaints to Medicare per 1,000 members

Standard
Stars C2719; CMS removes it starting with the 2029 Star Ratings21
Public number
0.30 national average, 2027 Star Ratings19
Example
Our judgment: a member facing change that goes badly can show up here
Customer serviceStars

Members' view of the plan's customer service

Standard
Stars C23, CAHPS survey19; CMS removes it starting with the 2029 Star Ratings21
Public number
90 national average, 2027 Star Ratings19
Example
Our judgment: a call center process change is felt here first
Key documents7 documents, from the change impact assessment to the adoption report
DocumentWhat it does
Change impact assessmentLists each process, role, and system a decided change touches
Redesigned procedures and job aidsDescribe the new way of working for the people who do it
Training plan and training recordsShow who must be trained on what, and who was. Medicare Advantage compliance training is required yearly and at orientation13
Go live checklistConfirms testing, training, and support are in place before cutover
State readiness reviewThe state's review before a new Medicaid contract or population, submitted to CMS: a desk review in every case, and an on site review for a new program or a plan new to the state12
WARN noticeWritten notice 60 days before a covered plant closing or mass layoff. Covered employers have 100 or more employees, not counting part-time staff; a plant closing covers 50 or more at one site1718
Adoption reportShows, team by team, whether the new way is in use and where it lags
Data it needs6 inputs to plan a change and see whether it took
DataWhy it's neededWhere it usually comes from
Rule and contract datesFix what must change and by whenFederal rules and state contracts8912
Process maps and volumesShow how work runs today and how much of it there isOperations teams and workflow systems
Roles and staff by teamShow who is affected and who needs trainingHuman resources systems
Training completionShows who has been trainedLearning management systems
Use of the new processShows whether people actually work the new waySystem logs and supervisor checks
Errors, backlogs, and timelinessShow whether the change is hurting regulated work, such as decision time limits9Operations and quality reports
How data moves5 flows between regulators, the change team, staff, supervisors, and the state
FromToWhatHow
CMS or statePlanNew requirements and their datesFederal rules, CMS memos, and contract amendments
Change teamAffected teamsWhat changes for each role, and the trainingWorkshops, job aids, and classes
Work systemsSupervisorsUse of the new process, errors, and backlogsReports and dashboards, often assembled by hand
PlanStateReadiness evidenceDesk review of documents; on site interviews with staff and leaders for a new program or a plan new to the state, at the state's option when a current plan adds a population12
PlanEmployees, the state, local governmentNotice of a covered closing or mass layoffWritten notice 60 days ahead17
Data exhaust5 things the process leaves behind, and what they can tell you
What's left behindWhat it can tell you
Training completed against work changedTeams trained on paper whose work did not move
Use of the old system after go liveWhere workarounds survive, and why
Timeliness in the first weeksWhether a change put regulated time limits at risk
Help requests by teamWhere the new way is hardest, and where training missed
Staff turnover after a role changeWhat the change cost in people, team by team

Our judgment on all rows. Little of this is published.

Sources21 sources
  1. Hughes, "Do 70 per cent of all organizational change initiatives really fail?" Journal of Change Management, vol. 11, no. 4, pp. 451-464, December 16, 2011. Abstract read at the University of Brighton research repository on November 12, 2026; that page returned an error on November 20, 2026, so the link is the publisher's DOI, which blocks automated reading. Link
  2. Damschroder, Aron, Keith, Kirsh, Alexander, and Lowery, "Fostering implementation of health services research findings into practice: a consolidated framework for advancing implementation science," Implementation Science, vol. 4, article 50, August 7, 2009. Link
  3. Damschroder, Reardon, Widerquist, and Lowery, "The updated Consolidated Framework for Implementation Research based on user feedback," Implementation Science, vol. 17, article 75, October 29, 2022. Link
  4. Proctor and others, "Outcomes for implementation research: conceptual distinctions, measurement challenges, and research agenda," Administration and Policy in Mental Health, vol. 38, no. 2, pp. 65-76, March 2011. Link
  5. Wiltsey Stirman and others, "The sustainability of new programs and innovations: a review of the empirical literature and recommendations for future research," Implementation Science, vol. 7, article 17, March 14, 2012. 125 studies in medical, public health, and mental health settings. Link
  6. Weiner, "A theory of organizational readiness for change," Implementation Science, vol. 4, article 67, October 19, 2009. Link
  7. Greenhalgh, Robert, Macfarlane, Bate, and Kyriakidou, "Diffusion of innovations in service organizations: systematic review and recommendations," Milbank Quarterly, vol. 82, no. 4, pp. 581-629, 2004. Abstract read. Link
  8. 42 CFR 422.122(b), Medicare Advantage Prior Authorization API, beginning January 1, 2027. Read at Cornell Law School's Legal Information Institute; eCFR blocks automated reading. Link
  9. 42 CFR 422.568(b)(1), Medicare Advantage standard organization determinations: 7 calendar days for items subject to prior authorization, beginning on or after January 1, 2026; 14 calendar days otherwise. Read at Cornell Law School's Legal Information Institute. Link
  10. 45 CFR 162.1002(c), medical data code sets, ICD-10-CM and ICD-10-PCS on and after October 1, 2015. Read at Cornell Law School's Legal Information Institute. Link
  11. HHS, "Administrative Simplification: Change to the Compliance Date for the International Classification of Diseases, 10th Revision (ICD-10-CM and ICD-10-PCS) Medical Data Code Sets," final rule, 79 FR 45128, August 4, 2014, implementing section 212 of the Protecting Access to Medicare Act of 2014. Link
  12. 42 CFR 438.66(d), state readiness reviews of Medicaid managed care plans: when required, started at least 3 months before, a desk review in every case and an on site review with staff and leadership interviews for a new program or a plan new to the state (optional when a current plan adds eligibility groups), the areas assessed, and submission to CMS. Read at Cornell Law School's Legal Information Institute. Link
  13. 42 CFR 422.503(b)(4)(vi)(C), Medicare Advantage compliance program training and education, at a minimum annually and at orientation. Read at Cornell Law School's Legal Information Institute. Link
  14. NAIC Big Data and Artificial Intelligence (H) Working Group, memorandum, "2025 Health Artificial Intelligence (AI)/Machine Learning (ML) Survey Analysis," May 12, 2025. 93 insurers surveyed under 16 states' market examination authority; self reported. Link
  15. Preiksaitis and others, "Ambient Artificial Intelligence Scribe Adoption and Documentation Time in the Emergency Department," Annals of Emergency Medicine, vol. 87, pp. 569-574, 2026. One academic emergency department; use was optional. Abstract read. Link
  16. Baldwin-Medsker and others, "Ambient Artificial Intelligent Scribes in Oncology: Impact on Clinician Experience and Documentation Burden," JCO Oncology Practice, online October 17, 2026. One cancer center, June to September 2025. Abstract read. Link
  17. 29 U.S.C. 2101 and 2102, Worker Adjustment and Retraining Notification (WARN) Act: definitions of employer, plant closing, and mass layoff, and 60 day written notice to employees or their representative, the state's rapid response entity, and the local government. Read at Cornell Law School's Legal Information Institute. Link
  18. 20 CFR 639.1, WARN purpose and scope, including (g): WARN does not replace laws or agreements that give additional notice. Read at Cornell Law School's Legal Information Institute. Link
  19. CMS, "Medicare 2027 Part C & D Star Ratings Technical Notes," September 30, 2026, updated November 4, 2026, national averages table. Link
  20. Bodenheimer and Sinsky, "From Triple to Quadruple Aim," Annals of Family Medicine, November 2014. Link
  21. CMS, "Medicare Program; Contract Year 2027 Policy and Technical Changes to the Medicare Advantage Program, Medicare Prescription Drug Benefit Program, and Medicare Cost Plan Program," final rule, 91 FR 17384, April 6, 2026, Star Ratings section: Complaints about the Health Plan and Customer Service removed beginning with the 2029 Star Ratings. Read at govinfo, November 20, 2026. Link